Manual runs overriding schedule
話題:
通用
Is there a way to not have manual runs conflict with the smart schedule? At times I turn sprinklers on for kids to have fun or to test a newly installed head for a few minutes. These manual runs (even for a minute or two) in these zones are not being run during the next scheduled run. This is frustrating and now I need to do a lot of manual runs to ensure lawn gets appropriate amount of water and is basically taking away my ability to auto schedule.
Thoughts?
瀏覽: 2117   
關注: 0